Threshold reports for 2/20,2/27,3/06,3/13,3/20

Threshold reports for 2/20,2/27,3/06,3/13,3/20 have been posted in the document library. I have included some information as well as some pictures from the reports.
—–
–          BillerReinhart observed steel reinforcement bars with section loss exceeding 25% of the original bar area.
–          BillerReinhart observed the Contractor during the in-progress application of SikaEmaco 1061 DR repair mortar in marked concrete repair areas on the plaza deck slab.
–          BillerReinhart observed post-tension cables with corrosive damage in the plaza deck slab