Valcourt Change Order CO#7 – November 2025 – Not a Bill
Scope: Remove bottom 12" of existing steel post and replace with new 3x3x5/16" T.S. (typical four locations) per Drawing S-7. Quote Includes: • Shop drawing...
Scope: Remove bottom 12" of existing steel post and replace with new 3x3x5/16" T.S. (typical four locations) per Drawing S-7. Quote Includes: • Shop drawing...
Remove corrosion on existing steel beam for welding. Supply and weld new plates to existing beam (typical one location) per Drawing S-8 Waterproofing & Restoration...
Plaza Deck/Valcourt Threshold - Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday November 10, Tuesday November 11, Wednesday November 12, Thursday...
Plaza Deck/Valcourt Threshold - Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday November 03, Wednesday November 05, and Thursday November 06,...
Plaza Deck/Valcourt Threshold - Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday October 27, Wednesday October 29, and Friday October 31,...
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday October 20, Wednesday October 22, and Thursday October 23, 2025. BillerReinhart observed the...
Plaza Deck/Garage Weekly Meeting with Valcourt and Biller Reinhart.
PROJECT: Plaza Deck and Parking Garage PROJECT DESCRIPTION: Online Permit - Removal of the plaza/pool decking including pavers, sand down to the concrete slab, waterproofing...
This change order deals with what as discussed in the Oct 2025 Board meeting on what Valcourt is going to try when fixing the currently...
Agenda for 10/30/2025 Clearwater Sand Key Club, Clearwater This is a brief overview of items to be discussed during the meeting.