Plaza Deck/Garage – Threshold Summary Report 18 – 01.02.2025
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 30, 2025.
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 30, 2025.
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 22, 2025.
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 15, Tuesday December 16, Wednesday December 17, Thursday December 18, and Friday...
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 08, Tuesday December 09, Thursday December 11, and Friday December 12, 2025.
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday December 01, Tuesday December 02, and Thursday December 04, 2025.
Change Order #8 - Not a Bill
Change Order #5 - Not a bill
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday November 24 and Wednesday November 26, 2025. BillerReinhart observed the inprogress installation of...
Biller Reinhart Engineering Group, Inc. (BillerReinhart) performed a site visit on Monday November 17, Thursday November 20, and Friday November 21, 2025. BillerReinhart observed the...
Scope: Remove bottom 12" of existing steel post and replace with new 3x3x5/16" T.S. (typical four locations) per Drawing S-7. Quote Includes: • Shop drawing...